Turnaround Maintenance: 225,000bpd Bonga Deepwater Field Shut Down
Operators of the Bonga deepwater oilfield, SNEPCO has shut it down so as to be able to carry out turnaround maintenance and invariably attain continuous optimum operations at the field, Thiday reports. The said maintenance will sure lead to a drop of about 200000 barrels in Nigeria’s daily crude oil production. The Bonga Oilfield is … Read more